Sorting Out The Hex

I’m currently reading a lot about Capenhurst, and the issue of just what happens to depleted Uranium Hexafluoride.

There are a number of issues which follow on from this research, but it is going to take a while before any report on it is completed.

In the meanwhile there are a lot of questions which have been thrown up.

Such as: –    Just how will all of this Hex be decommission ?

One thing is very obvious to me.

URENCO has created a major problem due to the way in which Uranium is enriched, and that is in the form of a very large quantity of depleted Uranium Hexafluoride.

A Little Light Reading.

Never let it be said that what I tend to read is frivolous in nature.

Well that’s what happens when one engages in serious campaigning work.

Yet needs must, as it is alleged they say.

So here are a couple of reports which I’ve been reading of late.

Civil Nuclear Police Authority Annual Report & Accounts 2016/17

That’s the body which runs the Civil Nuclear Constabulary, which describes itself as an Armed Force.

The report was published on July 19th, and makes for some fascinating reading.

Aside from a lot of statistical, financial, and pension payments data – 

It lists the following Key Facts :-

– The CNC has over 1080 Authorised Firearms Officers.

– It operates in 10 nukiller sites within the UK,  but not Capenhurst, Chapelcross, Springfields, or Wylfa.

&

– It has a budget which is over £100 Million.

Here is the line in the report which I like the best: –

‘We are capable of carrying out our duties in a flexible and dynamic way, instilling in ourselves a clear sense of purpose.

If we use force we do so in a manner proportionate to the threat, recognising and upholding the principles enshrined in the European Convention on Human Rights.’

Thus the next time you are confronted by any armed member of the CNC – you can be assured that they will of read the convention, and will act with all of its provisions in mind – – – or so it is alleged to be that way.

So now you know.

Nukiller particles

This is the other really interesting report which every anti-nukiller -power activist should download and read.

Particles in the Environment   Annual Report for 2015/16 and Forward Programme

This is a report which has been published by sellafield Ltd.

It is the one in which they show the amount of radioactive particles which they have detected along the coast of Cumbria.

Though those are just what they have managed to find in their sampling.

 

Thinking About What Follows on.

Warnings.

One of my favourite ways of referring to both Politicians and managers is that they work it out as they go along.

Yet a little brush with reality, or the realisation that what they want to do will get them in to a lot of trouble, might well get them worrying about getting the sack, or loosing a lot of votes for doing so.

Though many a manager or politician are so shielded from the real world, or do not socialise outside of their own class or social milieu, that they no idea about the social, economic, or environmental damage which they might do.

That’s why a lot of political campaigning comes down to showing just what will happen if various policies are enacted.

Thus a lot of anti-nukiller power campaigning comes down to researching about, and warning individuals what might happen if such various whizzo projects comes in to being.

Such a project is the proposed new coal mine plan for Cumbria

That’s why I think that all such proposals should have a check list of environmental problems which come with them as a matter of form.

Much in the same way what packets of chalk should carry a warning that criminal damage charges may result if they are used on pavements or walls.

Giving out the warnings.

Yet all this research and protesting will not be enough without being able to finance all the travel which is involved in this campaigning work, and the protests which go with it.

Or are there enough people who can undertake all the leafleting which needs to be done in order to get the message out to people.

Which comes down to a problem which faces us all the time.

Unlike in Belgium, France, Germany, or the Netherlands,

we just don’t have the thousands, never mind the hundreds of people who will come out to demonstrate.

We tend to think that an event is very well attended if 12 to 20 people turn up to it.

Though the experience of solo leafleting, or maybe as a group of 2, 3, 4, 5, or six activists on a leafleting session or picket is very much the norm.

That’s why we need to develop more co-ordinated local protests or leafleting sessions about the nukiller waste trains which go through the UK.

As a part of this we have established Working Alliance.

Yet we still come down to one major problem, and that is the high cost of getting to so any of the many different nukiller plants which are scattered throughout Cumbria & the NW.

This July there will be another leafleting session at the DRS nukiller waste trains depot in Carlisle, while in October there will be a couple of events to mark 60 years since the Windscale fire in .

That’s aside from all the ongoing work which needs to be done in order to raise public awareness about Capenhurst, Drigg, & Springfields.

Thus this appeal.

If you think this work is worth while, but can not involve yourself it, then please do make a fiscal contribution to either the Close Capenhurst Campaign, or Radiation Free Lakeland.

The Unworkable Proposed Merger of MOD Plod, The CNC, and BTP

A Unique force.

There is one aspect about the Civil Nuclear Constabulary [ CNC ] which we should always state whenever we write or talk about them.

The CNC refer to themselves as an Armed Force.

They are financed by the nukiller power companies and have very close links with the MOD.

They no longer guard all nukiller instillations such as Capenhurst or Springfields.

They do not guard the nukiller waste trains which pass through our city centres, and neither does the British Transport police [ BTP ] .

Yet the CNC do have powers of arrest, with no public accountability about the way they operate.

An Unworkable Proposal

Yet again the bright idea of merging the CNC, MOD Plod , and the BTP to protect nuclear sites and transport links is being touted by the Tory party.

This is an idea which has been around for a long time, but was ruled out the last time it came up a few years back.

Just consider this:-

– 95% of the BTP funding comes from Britain’s privatised train companies.

– While part of the CNC is funded by the nukiller energy companies,

&

– MOD plod is a part of the MOD.

So just who would land up paying for such a combined force would make for some very interesting negotiations.

That’s aside from just what the various companies might have a say in how such a new body might be controlled.

or

If it might be liable to any form of public accountability.

Never mind their different types of ‘training and operational needs’.

Differences in pay and remuneration.

There are also variations between MOD plod, The CNC, the BTP which would cause a number of other problems should such merger go ahead.

All three of them have very different pay structures, terms of employment, and retirement schemes.

What is really needed

Thus I just can’t see how any such proposed merger might be workable.

Though there is an urgent need to initiate a public outcry about the way the CNC operates, and just how we might better safeguard all the nukiller waste sites way in to the future.

Short Term – Long Term

We are now living through that what is an interesting and highly frightening political period.

Just two words sum up many of the problems we are up against:- Brexit and Thrump.

Yet we do need to look at what else is happening in the world, and start thinking beyond the next decade.

Here are just a few of these long term issues summed up in five headlines:-

‘Extraordinary’ levels of pollutants found in 10km deep Mariana trench.

What The New Fukushima Unit 2 Inspection May Indicate.

U.K. nuclear safety regulations place too low a value on human life.

7 million premature deaths annually linked to air pollution.

Analysis of “Scientists have just detected a major change to the Earth’s oceans linked to a warming climate”.

What worries me is how a lot of people concentrate upon very short term issues, and think about political action[s] in a very seasonal way.

While what is really needed is some long term day by week by month by year by decades long hard slog campaigning, and some major life style changes.

Radioactive Waste – A New Policy In The Making ?

What ever happened to the proposal to create a new Interim radioactive waste site for the UK ?

Some years ago there was a lot of proposals being make about just where this might be, but one by one all of these proposals seem of been quietly forgotten.

Though we still keep reading references to this idea on many government and nukiller industry documents.

My suspicion is that there is a new ground plan in place as to how this radioactive waste might be stored.

Here in a few news headline is why I suspect this is what might well be going on.

Chapelcross nuclear waste storage facility size increase approved.

Ministry of Defence chooses Capenhurst to store nuclear submarine waste

Routes nuclear waste from other power plants will travel to Bradwell revealed

‘ The intermediate level waste, which would come from Sizewell in Suffolk and Dungeness in Kent, typically consists of sludge, sand, gravel and metal.

Then we have last years Cumbria County Council decision to allow more waste to be stored at Drigg.

The key point to keep in mind is that these sites have existing NUCLEAR SITE LICENCES.

There is also a lot more room at Springfields to store such waste, or at Capenhurst for all the existing waste which will result when the existing Royal Navy nukiller powered submarines are decommissioned.

Then there will be all of the radioactive reactors which will come from the now being built Astute-class submarines.

As Sellafield is going to take over 100 years to clean up, with not much room for more waste, then we may well be seeing the start of a new and unannounced radioactive waste storage policy coming in to existence.

 

Radioactive Toshing

Toshing

The go ahead has just been given to store radioactive sludge, sand,  metal,  and  gravel at Bradwell.

This radioactive tosh will come from the Dungeness & Sizewell reactors.

It will be taken by Road to Bradwell from the railway station at Southminster.

Which Rail Routes ?

What this news story does not mention is which routes this waste will be transported to Southminster.

Yet we can work out some of this from the routes upon which used nukiller fuel rods are transported to Sellafield.

Sizewell.

All the used fuel rods from Sizewell are transported by road to Saxmunden, & then south via Shenfield.

There is a line from Shenfield to Southminster.

So that should be the logical route which it will take.

Dungeness.

All the used fuel rods from Dungeness are taken by train via Appledore, then on via Ashford International to Crewe, and so on to Sellafield.

Now comes the interesting questions.

Which route will be used to carry this waste ?

The line to Shenfield goes via Stratford, but which route will be used from Ashford to Stratford ?

&

At which point will it cross the Thames ?

What kind of containers ?

Of course we do not know exactly what levels of radioactivity this waste will be emitting, or Just how much of it there will be.

So we can only speculate about just which kind of containers it will be transported in, and just how many months or years it will take.

How long will it be stored ?

The other unspoken question is just how long it is intended to store this muck at Bradwell.

Could it be that this will become the back door way of creating a long term Low and intermediate level radioactive waste depositary for the UK ?

Though that will not work, as Bradwell, Dungeness, and Sizewell are going to be effected by rising sea levels.

Working on.

From time to time I stop and think that there has been so much to do of late, that most of my time has been spent in reading about, or working upon various issues. That includes a lot of networking, commenting various issues, and passing on information to others.

Thus there has been little time to pen anything new.

That’s always the problem with multi issue campaigning.

Well that’s the way it goes.

So to save some time I’ll just list a few of the issue I’ve been looking at, or working upon over the last few months.

The AP 1000 reactor.

Capenhurst.

The danger of Pavement parking.

Moorside.

The Pitchford Inquiry.

Prisoners for Peace.

Though that’s just a starter list.

At present I am in the middle of some work which relates to DRS & the transport of nuklller waste on the railways.

The good thing is that I should be able to pen a little more over the next month or so.

Renting Just Like SMRs

Rent to Buy

Mention housing to anyone who lives in Britain, and you will get to hear a very worrying list of anecdotal stories.

All of which show that everything to do with buying, selling, and renting housing is a legal or financial mess.

Not only a mess, but a very controversial one at that.

Take for example: –

Rent to Buy, which is refereed to as Buy to Rent, and gives no housing security to tenants If the landlord defaults on their mortgage.

Then there are landlords who complain about bad tenants,and tenants who complain about bad landlords. Both of which [ may ] have some very good reasons for doing so.

As I say – It’s a mess.

Now enter the Developers

Of course much of this mess comes down to how housing is regarded as a way in which to make a quick profit, rather than a source of long term housing, or long term income.

It all comes down to making a profit by any means, rather than looking at what might be achieved in the long term.

That’s why there are so many houses being built, or which have been built, in the middle of high risk flood plains.

Then comes all of the flooding which will result from Rising tides.

As with Housing the same with the Nukiller industry.

Many of the existing reactors are by the coast, and will be effected by rising tides within the next 20 to 30 years.

Yet the nukiller industry keep playing down this danger, as with everything else they do.

A modular exercise.

The current fashion is for the nukiller industry to talk about how all our problems will be solved by the construction of Small Modular Reactors.

Yet these Small Modular Reactors are like those flats which are being sold by developers way before the foundation work is done.

They are sold on the illustrations of what these flats might look like, but no one has any idea of the quality of the materials used, or just what the standard of construction work might be.

Then when they all go wrong, those who buy them as an investment will cry out that ‘it seemed like a good idea at the time’.

Meanwhile – The tenants get to suffer within these badly constructed slums of the future, and pay for the privilege of doing so.

While we the tax payers will be expected to pay for the long term clean up costs.

Sounds familiar ?